Help is coming for a Jersey Shore town that's losing the man

sport2024-05-29 10:13:55283

NORTH WILDWOOD, N.J. (AP) — A long-running sandstorm at the Jersey Shore could soon come to an end as New Jersey will carry out an emergency beach replenishment project at one of the state’s most badly eroded beaches.

North Wildwood and the state have been fighting in court for years over measures the town has taken on its own to try to hold off the encroaching seas while waiting — in vain — for the same sort of replenishment projects that virtually the entire rest of the Jersey Shore has received.

It could still be another two years before the U.S. Army Corps of Engineers and the New Jersey Department of Environmental Protection begin pumping sand onto North Wildwood’s critically eroded shores. In January, parts of the dunes reached only to the ankles of Mayor Patrick Rosenello.

But the mayor released a joint statement from the city and Gov. Phil Murphy late Thursday night saying both sides have agreed to an emergency project to pump sand ashore in the interim, to give North Wildwood protection from storm surges and flooding.

Address of this article:http://sudan.quotesbonanza.com/content-30d499546.html

Popular

Netflix fans DEMAND a second season of streaming site's hit new show just days after its release

Iran helicopter crash: Rescuers say 'No sign of life' at chopper crash site

Legendary NFL center Jim Otto dies aged 86

China's AG600 large amphibious aircraft advances toward certification

A Kentucky family is left homeless for a second time by a tornado that hit the same location

Bradley Cooper holds his daughter Lea's hand while taking her for a walk in New York City

Will Smith reveals how his Bad Boys: Ride or Die co

Thomas Detry's late birdie assured him of a top

LINKS